Enter your keyword

Lahore Orange Line Metro Train Depot

Lahore Orange Line Metro Train Depot

IN Construction
portfolio
Investor Name:
Published Date:
January 1, 1970
Location:
Value:
Architecture:
About Project

Lahore Orange Line Metro Train Project, Depot at Dera Gujjran (Package-III)

Client: Lahore Development Authority

Scope of Work:

  • Project Area 206,500 M2
  • Frame Structure Bldngs Area 27,000 M2
  • Pre-Engineered Buildings 41,980 M2
  • Reinforced Earth Wall 4,231 M2
  • Internal Roads Length 3.93 KM

Key Items of Work

  • Concrete 53,000 CM
  • Steel Reinforcement 8,110 TON
  • Asphaltic base/wearing 19,400 TON
  • Sub-Base / WBM 24,840 CM